NORA Hotel: Corrective trellis punch-out + complete field refinish 6 project photographs
All projects

Corrective trellis punch-out + complete field refinish

NORA Hotel

A corrective field refinish that brought a rough, blotchy architectural trellis finish back to the visual standard expected at turnover.

General contractorMoss Construction
RestorationNew ConstructionCommercial
01

The condition

The prior coating appeared rough and blotchy and emphasized visible tin-canning across the installed trellis work.

02

AMF’s response

AMF performed a complete corrective refinish in the field, managing preparation and application around the completed hotel façade.

03

The outcome

The architectural trellis reads as a deliberate, consistent design element rather than a finish defect at closeout.

Scope + system

What the work required.