Fort Pickleball: Corrective color-change refinish 5 project photographs
All projects

Corrective color-change refinish

Fort Pickleball

A corrective color change executed on installed storefront and architectural metal at the first pickleball stadium project.

General contractorMiller Construction Company
RestorationNew ConstructionCommercial
01

The condition

Completed architectural elements required a color correction after installation, with surrounding façade, glazing and finished surfaces already in place.

02

AMF’s response

AMF protected the adjacent work, prepared the existing finish and completed a controlled color-change refinish in the field.

03

The outcome

The installed metal was brought into alignment with the corrected design direction without replacement.

Scope + system

What the work required.